Command center forevery project & site
KPIs, projects, trips, delivery progress, equipment and product reports, user management, and trip issue approval — everything your office team needs in one dashboard.
What you get
Six pillars of the office dashboard
Role-based access — you only see the areas your company role allows.
Projects & sites
Create projects, upload alignment data, manage products and places, configure sites (dates, chainage, foreman), and monitor every active trip on site detail pages.
Dashboard KPIs
Company-wide snapshot: trips by status, site progress, delivery percentages per product, equipment counts, and recent field activity.
Equipment report
See how each truck or machine contributed to trips — scores, utilization, and drill-down by project and site.
Products report
Track planned vs actual delivery by product unit (e.g. m³), active trips in progress, and analysis dialogs for variance.
Nearby equipment
Discover registered equipment near your worksites to plan hires or coordinate with owners in the marketplace.
User management
Maintain company workers, roles, and access. Invite office staff; field workers use the same company directory on mobile.
/dashboard
Your home screen after login
Executive snapshot and quick actions — tap a product row to open the same analysis as the full products report.
- Total cars, users, projects, active sites
- Material delivery — planned vs actual per product with progress bars
- Trip statistics — loading, driving, unloading, unloaded, needs checking, approved
- Site statistics — not started, loading, done, foreman assigned or not
- Recent trips, sites, and projects for daily standups
Quick action tiles
Multi-company users: switch active company from the header dropdown before working.
Open dashboardProjects — where everything starts
/dashboard/projectsHome — search, export CSV, create, and drill into each job.
Upload CSV
Survey alignment with chainage + coordinates. Example row: 13+800,500000,1200000,1500.5
From map points
At least two WGS84 points, interval in meters, optional starting chainage — click the map to add points.
Recommended setup order
- 1Create project — upload CSV (chainage, easting, northing, elevation) or draw from map points
- 2Add products and product places along the alignment
- 3Assign project members — drivers pick equipment when required
- 4Manage sites — chainage segment, dates, products & places per site
- 5Open site detail — trips, stats, settings, generate report
Site detail
.../sites/[siteId] — control tower for one corridor
Trip tables, delivery statistics, expected trips per place, site settings, paper QR, and formal report generation — all in one page.
Trips table
Live statuses, edit where allowed, trip issue banners for driver reports and foreman classification.
Trip issue approval
Backoffice approves or rejects — fixed report values; some outcomes trigger per-trip equipment report.
Learn moreSite settings
Foreman, average car speed, loading/unloading times — often required before save.
Loader paper QR
Print QR for loading yards without phones at the handoff point.
Generate report
Recalculate equipment-per-trip scores for completed trips that calendar day.
GPS verification: unloaded trips may show as "needs checking" until positions are compared to survey data (~100 m). Then approved when verified.
Reports that close the loop
Turn field trips into numbers management can trust.
Equipment report
Sidebar → Equipment Report
- Pick date range with calendar
- Filter by project and site
- Driver-centric compliance-style summary
- Drill into individual equipment scores
Products report
Dashboard tile → Products
- Target vs actual delivery across projects
- Active trips in progress per product
- Search and filter by project / product
- Product analysis — charts, progress, logistics views
- Approved trip issues affect totals via fixed report values
Nearby equipment — sidebar list/map to find machines near your worksites for hire planning.
/dashboard/CompanyUsers
User management
HR and admins maintain the company directory. Project engineers still add workers as project members for field access.
By phone (Telegram)
Enter phone, fetch preview, assign role — worker joins under current company. They log in with the same number on web and mobile.
Without Telegram
Loader-only path — role cannot be changed later. Use when a yard worker has no Telegram account.
Self-service /register is not wired — onboard via User Management.
Start managing projects in the dashboard
Phone + Telegram code. Switch company if needed. Field teams keep running trips on mobile — you see the results here instantly.